Call today for an Estimate 303-238-RECON (7326) | info@RECONCC.com
Specializing in HOA, Commercial, Apartment Reconstruction and Restoration projects.
Reconstruction & Restoration
Vistoso 1
SCOPE: The property manager had difficulty finding a construction company that had the expertise for this project. He valued RECON’s experience from another job and trusted us for this project. The scope included removing an existing sheer wall to open up and renovate the interior space to make room for a new community center room. Engineered and designed structural steel sheer wall assembly, where beams weighed as much as 1,000 lbs., and required moving by hand. RECON successfully completed this complex project, and the property manager, board, and developer were extremely pleased with the quality work. ~ 2015 Project
Fairways Interior 2 Image
SCOPE: Renovations and repairs to the interior and exterior apartment complex. Interior renovations to each apartment included upgrading carpet, paint, appliances, flooring and lighting. Exterior renovations and civil work included, common area upgrades (includes BBQ/Picnic area, Fire Pit), upgraded landscaping, added covered parking, pool upgrades (includes enlarged pool deck, new concrete coat decking), dog park amenities, court yard upgrades, clubhouse and fitness upgrades. There was a complex schedule with tight turn times and minimal disruptions to existing tenants. ~ Project duration 2014-2015
summit
SCOPE: This project involved repairs to building envelope and structural components of this multi-family community. In all, 44 buildings were repaired over a two and half year period. This project also included extensive civil work, regrading at the majority of all buildings, drain pans, and drain channels. Building envelope repairs included flashing, stone, and siding repairs around windows. After completion of the structural repairs, interior cosmetic repairs were performed on 326 units. There were 200 tons of structural steel added, the excavation of over 10,000 cubic yards of soil, and 3,000 cubic yards of concrete. ~ Project Duration 2006-2008.  RECON has done small jobs in 2015 and 2016 for the Board.
Williams Street Condos Exterior 1
SCOPE: This projected included converting 61 bathrooms within the two occupied buildings with a mandatory turn time of one day per bathroom. Completed some stairwell structural repairs, and converted and renovated two common areas into studio apartments. ~ 2013 Project