Metro Lofts

Published by . Filed under Uncategorized. Total of no comments in the discussion.
Phase I – Stairway tower # 2 replacement, which included scaffolding, all necessary safety barricades and protection, remove and replace 9 concrete landings, steel decking, steel edge, galvanized steel posts, remove existing tread pans, install new stair treads, seal, prime and paint.  Painting project included 3rd and 4th floor balcony decks and railings (prep, wire wheel rust, […]

Read More...

Dakota Station

Published by . Filed under Uncategorized. Total of no comments in the discussion.
Phase I – included replacement of 15 decks (including structural helical piers), and 4 stairway towers at Dakota Station II.  This project required major communication between the engineer and Jefferson County for designs, inspections and sign off.  This project also called for extensive homeowner communication. Some homeowners and tenants stayed in hotels for a few […]

Read More...

Highland View

Published by . Filed under Uncategorized. Total of no comments in the discussion.
This property was in dire need of deck replacements and repairs.  The project included complete replacement of ten decks, and repairs to 39 decks (some minor and some major repairs), along with staining.  This project required extensive coordination and communication between our crew and the homeowners.  The biggest challenge on this project was finding rotted […]

Read More...

Auraria Lofts

Published by . Filed under Uncategorized. Total of no comments in the discussion.
RECON Construction completed 4th floor balcony flashing repairs and weep hole inspections. RECON is continuing to work on other repairs and testing window leaks on this property. ~ 2018

Read More...

Condos at the Boulders

Published by . Filed under Uncategorized. Total of no comments in the discussion.
Extensive concrete, civil grading and downspout repairs throughout the community. Excavate, remove and replace concrete, saw cut concrete and replaced in areas where feasible, civil work included removing landscaping, rework irrigation, excavate, regrade and install new landscaping.  Phase I – Fall 2015, Phase II – Fall 2017, Phase III – Summer 2018.

Read More...